A bridge over the Iskar River – part of the New Runway at Sofia Airport
Investor: MAK/ADMAK J.V
Services provided: Reviewing and preparing an Expert Opinion on the Construction section of the technical project for the site.
GBA: Technical parameters: bridge length: 36.5 m, width: 460.00 m
Period: 2003
Description:
- reviewing calculations, drawings and explanatory notes for the reinforced concrete bridge construction
- researching the rules and regulations in force
- writing up a technical report to include both an expert opinion regarding a revision of the project and recommendations for preparing technical drawings